Monitoring the installation of the Solar Systems and developing institutional arrangements with the beneficiaries in Lahej and Abyan Governorates.





-          Project Description
In Yemen, since mid-March 2015, the conflict has spread to 20 of the country's 22 governorates, prompting a large-scale protection crisis and aggravating an already dire humanitarian crisis brought on by years of poverty, poor governance and ongoing instability. The number of people in need of some form of humanitarian assistance has increased by 33% from 15.9 million to 21.1 million people. This means that 80% of Yemen's population now requires some assistance to meet their basic needs for food, water,energy, healthcare, shelter and other basic supplies. More than 12 million people have been directly affected by the conflict, including more than 7 million children.
The EU-funded Enhanced Rural Resilience in Yemen Program ERRY is to enhance the self-reliance of rural people and communities to better cope with crises, risks and shocks. The project is being initiated, and will be implemented for a period of three years. The project will be implemented in eight districts within four governorates as follows:
  • Lahj Governorate: Tuban district and Tour Albaha district.
  • Abyan Governorate: Kenfar district and louder district.
Through ERRY a resilience approach is being spearheaded, to enhance collective action, aid delivery and economic recovery. The program is designed to enhance the self-reliance of rural people and communities to better cope with crises, risks and shocks. The solar component of the program will support communities benefit from improved and more sustainable livelihoods opportunities through better access to solar energy;
The solar component aims to build community energy resilience in the target areas. Through its interventions it enhances community-based access and application of sustainable solar energy across rural communities in the project targeted areas. Priority will be given to rural basic services such as health, water supply, education, communal services, market places, solar water pumping,.etc. that contribute and build community energy resilience. It also promotes application and spreading of the use of solar water pumps in the agriculture sector within a comprehensive package including use of efficient water irrigation system. Furthermore, it also promotes micro solar-based business development. Following are the key planned intervention for building rural community solar resilience in the targeted districts:
·         Expansion of solar energy applications to strengthen rural energy resilience, capacity building and recovery;
·         Decentralized solar energy services installed in public service centers to reinforce livelihood resilience of vulnerable rural communities;
·         Solar energy introduced to support enhancement of rural community energy resilience;
·         Marketing of micro-business development for solar energy supported;
The first step in the process of building energy resilience in the targeted districts is to carry out socio-economic and solar needs/gaps assessments. A team of two national consultants will be assigned to carry out these assessments.
Monitoring Objective:
Adwar Organization For Youth Development to undertake inspecting task, testing of solar energy system equipment for UNDP solar energy project, Specified in Lahij and Abyan governorates, 24 solar energy system for each governorate, as follow:
Lahej Govenorate: 12 solar energy system, includes two district.
  1. Tuban districts: 6 solar energy system/ (2 at schools + 2 unit Health + 1 at Office of Education + 1 at Health Office).
  2. Tawr Al Baha district: 6 solar energy system/  (2 at schools + 2 unit Health + 1 at Office of Education + 1 at Health Office).
Abyan Governorate: 12 solar energy system, includes two district:
  1. Khanfar districts: 6 solar energy system/ (2 at schools +2 unit Health + 1 at Office of Education + 1 at Health Office).
  2. Lawdar district: 6 solar energy system/  (2 at schools +2 unit Health + 1 at Office of Education + 1 at Health Office).
Adwar Organization to undertake inspecting, testing of solar energy system equipment to ensure compliance of all delivered solar systems equipment and conformity with the pre identified quality standards and technical specifications at central level, and to undertake institutional arrangement at local level, consult with all stakeholders at governorates, districts and community levels and supervise the take-over from the supplier to the beneficiaries and ensure installation and operation of delivered solar energy systems are smooth and well performed through conducting field monitoring for all process of handling, delivering, installing and operating solar energy systems at local level in the targeted districts to guarantee proper delivery, installation and operation of the solar energy systems.

attached:Technical proposal   - Time Plan  - Detailed financial offer.







Technical proposal
Results
Monitoring and Evaluation Methodology
Source of verification
Indicator
Description of activity
The main activity
M
7 staff/ 3 Management crew and 5 ENG crew have the capacity to supervise the implementation, control and develop a mechanism solid institutional arrangement proper solar energy to the beneficiaries for delivery.




The evaluation method for the achieved results of the project will be through the indicators that support targets achievement through the number of beneficiaries from the activities, their evaluations (performance, uniqueness, diversity, marketing professionalism, promotion) and through the achievement, reports and constant follow up and activities evaluation through all stages of the project management .

Management Mission:
Demonstrate integrity and fairness by ensuring that all solar energy equipment and components have met the quality standards and required technical specifications and all solar systems delivered, installed and operated properly and safely to ensure providing sustainable solar energy systems for building and strengthening rural community energy  resilience in the targeted areas.
Curriculum Vitae

·  The Management crew have skills in supervision and implementation and has the capacity for analysis and reporting.


·  The ENG crew Have community institutional development experience and able to design delivery, receipt, and monitoring systems. and display professional,  technical/practical and first-hand working experience in solar energy applications.
1. Choose management and Eng staff:
crew:

Management crew:

-          Project Manager
-          Logistics Coordinator / Lahej - Abyan
-          Financial
-          Lahej – Abyan


Technical crew:
-          Head of Engineers Team
-          Field Engineer - Tor Albaha
-          Field Engineer -  Toban
-          Field Engineer -  Khanfar
-          Field Engineer -  Lodar
-           


The mechanism of choice: will choose the technical team from Lahej and Abyan Govenorates in accordance with the approved criteria.

Institutional arrangement
1
Interaction and cooperation of official bodies and beneficiaries and civil society organizations in Govenorates Abyan and Lahij meet the rapid implementation of the process smooth and well.
Communications - relationships - encounters with the beneficiaries -
Official diary - direct contact - Documents UNDP
The existence of interaction and cooperation of official bodies and beneficiaries and intermediaries and civil society organizations in the two Govenorates accounted for 95%


Find detailed information on the names of the targeted institutions, officials and the number of beneficiaries of the solar system's services
2. Preparation of a plan Consult with the different stakeholders at the governorates, district and community levels.
- coordination and communication with the education and health offices in the Govenorates of Abyan and Lahej and in targeted districts in the project and find ways to cooperate and facilitate the work of the project team.
- Find intermediaries through communication with civil society organizations working in the two Govenorates .
Development of a solid institutional arrangement at local level in consultation with all stakeholders at governorates, districts and community levels and supervision of the take-over from the supplier to the identified beneficiaries and ensure proper delivery and sustainable use of the solar energy systems.





Inception report including institutional arrangement framework and a set-up of a code of practice for sites assessment, preparation of the systems, handling, installation, assembly of all component in a system, commissioning and operation with special requirements for all equipment, and hand over modality to the beneficiaries and the maintenance guideline.


Precision and skill in the preparation and processing - and prepare forms smart and professional reports


Forms of delivery, examination and monitoring
And contracts and plans technical, administrative and final reports






Existence of the institutional arrangement and technical installations monitoring mechanisms and appropriate documentation in close coordination with the project team including donor requirements.



Existence of a code of practice for sites assessment, preparation of the systems, handling, installation, assembly of all component in a system, commissioning and operation with special requirements for all equipment, and hand over modality to the beneficiaries and the maintenance guideline.


Existence of a clear set of regulations and technical and regulatory requirements for Control and field monitoring.
3. Preparation and processing of documents, procedures, reports, and forms examination and verification control and delivery of solar energy to the beneficiaries in accordance with the standards and specifications adopted, in addition to administrative facilities, as follow:
Technical equipment:


- forms for inspect the equipment and accessories solar energy.
- Check the date of manufacture and the extent of compliance with the specification of the purchase from the supplier and its compliance with quality standard, technical specification forms.
- Inspect the equipment and the safety of transport forms to the beneficiaries.
- Evaluation of the targeted sites forms.
- Evaluation of the installation and operation of all solar systems smooth and good performance forms.
- Delivery to the beneficiaries forms.
- Beneficiaries in writing signed by the proper use and preservation and maintenance of the solar power system's commitment forms.
- The final technical report forms.
Administrative equipment:
- Contracts forms administrative, technical and operational team.
- Documentary Session of the financial operations of exchange form.
- Preparing the scientific field manual plan.
- Implementation course of the beneficiaries in the installation and maintenance of solar energy plan.
- form the financial report.
A technical report of the results of the test samples and their conformity with the specifications and quality standards.
Follow-up - and note - examination
Test - tools match the samples with the specifications - Test report

Satisfaction rate of 95% of the beneficiaries and supporting the samples of equipment test results before delivery of the work team.
Testing all sample of representing required equipment before delivery using reliable testing instruments and check their manufacturing date, their existing situation, storing conditions, handling methods and transportation safety, and   verify their compliance with the specified quality standards technical specifications and safety norms and submit  Technical Report.
Testing all sample
2
enhancing the link between suppliers, government, customers and other stakeholders and create partnership and networking between solar dealers, local private sector and key stakeholders within the target governorates




Installation and delivery and operation of the system 24 Solar in four districts in the Govenorate of Abyan and Lahej has been achieved.



- To increase insights into the use of solar PV in  social services facilities (health, schools.), monitoring and evaluation activities are required.


outdoor lighting, make health facilities more accessible as an attractive social landmark for local communities.

Improved emergency medical interventions, Electrical equipment required for health services: devices, appliances and infrastructure, Electrical equipment required for health services: devices.
- Performance monitoring (inputs, outputs, activities, plan commitment, well performance, constant follow up, supervision visits, reports and meetings)

Technical Reports
-  Ensure examination, installation, delivery and operation of the equipment at the targeted sites are properly accounted for 90%


Existence of a clear set of regulations and technical and regulatory



- Review of good practices in youth development reveals that capacity building on conflict sensitivity & conflict preventionfor the project team to ensure the success of the project. 


The presence of lighting with the complex security situation led to a feeling of greater safety, and has a positive impact on children's ability to study well.


A-service Lighting in rural health facilities, mainly at night. Therefore, using a renewable energy system for lighting will improve the quality and availability of light significantly, which will lead to improve medical emergency interventions, including first aid, birthing and surgery
Most of social services facilities including health facilities, schools and communal services offices in the target districts are owned by district councils. Hence, it is their responsibility to operate and maintain the installed systems. This is a challenging situation, as most of the district councils do not have a maintenance budget set aside. This leads to premature failure as the systems are not attended in time when there is a problem. Therefore, it is recommended to create a sustainable maintenance mechanism for regular maintenance and for replacing defect components of the PV system along the lifetime. For instance, establish maintenance and replacing fund. On the long run, system maintenance is the backbone of the sustainability of solar PV systems.
- The investment costs of PV systems are high; therefore systems can be stolen in remote areas. Some health facilities, schools, or communal services offices lack the safety of fences or other measures that prevent installed systems from being stolen. Anti-theft screws can keep the solar PV modules secured. Another option to secure the solar PV modules is through the welding of module frames together, if possible with a fixed foundation;
And it will consist of interventions during the team:
The implementation will be in two directions:
I: Management Team:
- Communicate with the supplier and recipients
- Visit the targeted sites to facilitate the task of the technical crew.
- Coordination with local civil society organizations in the two Govenorates.
- Supervising the work and the performance of the technical crew.
- Providing all the needs and requirements of the technical team in carrying out their task with ease.
- Signing of the receipt by the beneficiary.
- The receipt of receiving reports of the target.
- The receipt of reports and forms examination, inspection and evaluation of the installation of the technical crew.
- Photographic documentation and media protruding.
II: Technical team:
- Check for fluid transfer equipment and compliance with specifications and quality standards.
- Make sure to meet all compliance and quality standards and technical specifications and safety standards requirements.
- Choose a specific official to run the system and keep it in the targeted sites.
- Visit the sites and evaluate and determine the appropriate places for installation.
- Supervision of solar power systems before and after the installation of community service sites.
- Test all equipment before installation target sites.
- Processing Machinery guidelines for maintenance of the beneficiaries.
- Technical reports for inspection, installation and operation of solar energy delivered preparation.
Fieldwork administrative and technical team for the Govenorates of Lahej and Abyan
3
• Graduated 24 beneficiaries in  the system solar energy area.

• Increasing awareness for solar PV systems among the local communities and social services in the target districts, through organizes education campaigns.
Monitoring and evaluation - and the practical application and training - Documentation - Media protruding
The names of the beneficiaries - the final evaluation
24 beneficiaries of the training they have skills and abilities in the installation and maintenance of solar energy and conservation.
Conducting a specific training program on operation and maintenance of solar PV systems for local working staff, which is likely to increase efficiency and sustainability. The training program can be launched simultaneously with the installation of the solar PV systems. Moreover, training of local staff on management of energy stored in batteries is necessary; including the operation of critical, important and non-important loads, as well as installation and regular maintenance, replacing spare parts, checking of the electrolyte in batteries, corrosion cleaning, checking and replacing protection fuses, and short-circuit problems.
-  When designing and implementing training program or awareness campaigns, take into consideration the sensitivity of females’ situation, particularly, venue of training and duration of the training program, as well as level of education;
1.     The implementation of training two courses for beneficiaries in the governorates of Abyan and Lahij in the field of installation and maintenance of solar energy system and sustainability.
And it will be targeting and selection of 12 trainees from the recipients in each governorate a total of 24 trainees.
  Training for 8 hours of training for two days in each governorate.
Education and training to the beneficiaries of the solar system in the governorates of Abyan and Lahej
4
Practical and field guide contains Altalimyat during installation, monitoring and maintenance of solar and handles all activities to install and operate, as well as regular maintenance procedures guideline
Monitoring reactions
Preparation, processing and achievement
operational manual and a practical field guide listing the essential issues that require attention during installation, follow-up and maintenance. The compiled manual should address all activities of installation and operation as well as regular maintenance procedures guideline.
2.             Scientific Field Manual Preparation
Prepare operational manual and a practical field guide listing the essential issues that require attention during installation, follow-up and maintenance. The compiled manual should address all activities of installation and operation as well as regular maintenance procedures guideline. This manual will be regarded as a practical field guide and a hand-on and accessible manual. The beneficiaries of this guideline are the rural community beneficiaries.
user manual and should be delivered to end-users social services facilities and other beneficiaries. The manual should illustrate operation, monitoring and energy management of the system.

Completion of technical and administrative reports final showing in a transparent manner what has been implemented in the control and supervision of the inspection and installation and delivery of the solar energy system for beneficiaries
Results Evaluation Monitoring (achieving targets, results and effects)
Technical and administrative final report
Quality and excellence achievement reports final technical and administrative reflect what has been implemented in the control and supervision of the inspection and installation and delivery of the solar energy system for beneficiaries
-  Submit Final Report verifying fulfillment of all compliance requirements, quality standard, technical specification, and safety norms for all equipment, components. And confirming all solar systems installed in an integrated and compatible manner and well operated.
- Literary report and photos.
- Financial report with all financial documents.
- Send reports.
Technical, administrative and financial reports final processing and send
5


Time Plan
M
Activities
Team port
The time period in weeks (December 2016 - January 2017)
December
January
1
2
3
4
1
2
Activity 1.1
Choose the institutional and technical staff.
Organization management Adwar






Activity 1.2
Preparation of a plan Consult with the different stakeholders at the governorates, district and community levels.
Management Team






Activity 1.3
Preparation and processing of documents, procedures, reports, and forms examination and verification control and delivery of solar energy to the beneficiaries in accordance with the standards and specifications adopted, in addition to administrative facilities
Technical Team






Activity 2
Testing all sample.
team leader - Technical Team






Activity 3
Fieldwork administrative and technical team for the Govenorates of Lahej and Abyan.
Administrative and technical team






Activity 4
Education and training to the beneficiaries of the solar system in the governorates of Abyan and Lahej
Administrative and technical team






Activity 5
Technical, administrative and financial reports final processing and send
Administrative and technical team